Quick Facts
Introduction
A viral video says Maryam Nawaz just announced a 95% subsidy on solar tube wells. Here is when it was really announced, how the scheme works and its status.
A clip titled "Bari khushkhabri! Maryam Nawaz ka bara elan, Punjab mein solar panel par 95% subsidy" has been shared widely in the last few days, with thousands of likes and shares. Many farmers are now asking how to apply. Before you spend money on documents or pay any agent, it helps to know where this news comes from and what the scheme actually offers.
For related updates, explore Banking Info, Scholarships, Jobs and for more information.
Where the Viral Clip Comes From
The footage in the video shows the Chief Minister speaking at the "CM Punjab Gandum Support Programme" ceremony, where tractors were handed over to wheat farmers. The caption on screen says she announced a historic subsidy for the solarisation of agricultural tube wells.
That ceremony took place at the Rice Research Institute in Kala Shah Kaku. The Nation reported it on 16 May 2025, saying the Chief Minister announced "a 95 percent subsidy on solar-powered tube wells" while addressing the event. So the clip is old footage being shared again in November 2026, not a fresh announcement.
What Was Announced at That Ceremony
| Announcement (May 2025) | Detail as reported |
|---|---|
| Solar tube wells | Subsidy of up to 95 percent on solarisation of agricultural tube wells |
| Kissan Card | Loan limit doubled from Rs 150,000 to Rs 300,000 |
| Wheat farmers | Direct support of Rs 5,000 per acre instead of a support price |
| Tractors | Free and subsidised tractors for wheat farmers, with 20,000 subsidised tractors promised for the next year |
| Machinery | Agricultural machinery rental centres in every tehsil |
The reports from that day did not explain who would get the 95 percent, for which system size, or how farmers would apply for it. That is why it is better to read the 95 percent figure as a ceiling announced in a speech, not as a fixed rate for every farmer.
How the Solar Tube Well Scheme Actually Works
The 95 percent announcement was an addition to a scheme that had already started. The Punjab government announced the CM Solarization of Agricultural Tubewells programme in January 2025 and inaugurated it on 1 February 2025 with a computerised draw.
| Detail | Phase 1 information |
|---|---|
| Target | 8,000 agricultural tube wells converted to solar |
| Budget | Rs 9 billion in subsidy |
| Basic eligibility | Punjab resident owning at least one acre of agricultural land (full criteria below) |
| Applications received | More than 530,000, of which 385,000 were declared eligible for the draw |
| Selection | Computerised draw (balloting) |
| Type of tube wells | About 87% diesel and 13% electric tube wells were to be converted |
| Application portal | cmstp.punjab.gov.pk, with the form also available on agripunjab.gov.pk |
Subsidy by System Size
| Solar system | Government subsidy |
|---|---|
| Up to 10 kW | Rs 500,000 |
| Up to 15 kW | Rs 750,000 |
| Up to 20 kW | Rs 1,000,000 |
Farmers selected in the draw chose an approved vendor in their district, and the vendor installed the system. The government said a farmer moving from diesel to solar could save more than Rs 10,000 a day during the irrigation season. Even if your own saving is lower, cutting diesel cost is the main benefit, because a solar tube well has almost no running cost on sunny days.
One point causes confusion online. Some websites write that the scheme gives an 80 percent subsidy and that the farmer pays 20 percent. Government statements reported in the press give the fixed amounts above, and the Chief Minister's speech mentioned up to 95 percent. Until a fresh notification is issued, check the subsidy share with the Agriculture Department and do not rely on figures from private websites.
Official Eligibility Criteria
The scheme's official portal lists these conditions for solarising both electric and diesel tube wells:
- The applicant must be a resident of Punjab and attach a copy of a valid CNIC. Only one solar system per family will be given.
- The applicant must own at least one acre of land in Punjab.
- The agricultural land must be in the revenue boundary of the same district where the application is submitted, with the Fard-e-Malkiat attached as proof of ownership.
- Only solar systems of 10, 15 or 20 kW will be considered.
- Electric tube wells: the applicant must own the tube well and submit the last paid electricity bill of the tube well connection as proof. Non-payers and defaulters will not be considered.
- Electric tube wells: the electricity connection must have been installed on or before 30 October 2024.
- Electric tube wells: the applicant must have a 3-phase electricity connection.
These are the criteria published for the current programme. If a new phase is announced, the dates (such as the 30 October 2024 connection cut-off) may change, so read the notice again before applying. The full list is on the official eligibility page.
District Quota
Tube wells are not given on a first-come basis across the province. Each district has its own quota, and the draw is held against that quota, which is why the land must be in the district where you apply. The district-wise numbers are published on the official District Quota page. Check your district's share before you apply, because districts with many applicants and a small quota have tougher competition.
Is Registration Open Now?
No new registration has been officially announced. Applications for the first phase are closed, and its first draw was held in February 2025. Some websites claim a second phase for another 10,000 tube wells will open, but we could not find any official notice of a Phase 2 registration date on government channels.
If the government opens a new round, it will be announced by the Punjab Agriculture Department, and applications are likely to go through the same official portal. Do not fill forms on look-alike websites, and do not give your CNIC or land record to anyone who promises a "confirmed" solar system.
What Farmers Can Do Now
- Make sure your Fard-e-Malkiat is in your name and that the land is in the district where you will apply.
- Keep your CNIC and a mobile number registered in your own name ready.
- For an electric tube well, keep the last paid bill ready, clear any arrears, and check that the connection is 3-phase.
- Note your tube well details: whether it runs on diesel or electricity and the pump power. These decide whether you need a 10, 15 or 20 kW system.
- If you applied in Phase 1, check your status on the official portal with your CNIC before applying again.
- Get a Kissan Card if you do not have one. It gives access to interest-free input loans for seed, fertiliser and other inputs. Read our Kissan Card Phase II guide.
Beware of Fake Calls and Agents
Viral clips like this one are often followed by calls and WhatsApp messages from people who ask for a "registration fee" to get a farmer into the scheme. The government draw is computerised, and nobody can buy a place in it. Never pay an agent, and never share an OTP or bank PIN.
Not the Same as the Free Home Solar Scheme
The tube well scheme is for farmers and their agricultural tube wells. It is different from the CM Punjab Free Solar Panel Scheme for homes using up to 200 units of electricity a month, whose second phase was approved in November 2026. Details are in our article on the Punjab Free Solar Panel Scheme Phase 2.
FAQs
Has Maryam Nawaz announced a new 95% subsidy on solar tube wells?
No. The 95 percent subsidy was announced on 15 May 2025 at a wheat farmers' ceremony in Kala Shah Kaku. The video going viral now is old footage.
How much subsidy does the solar tube well scheme give?
In Phase 1, the subsidy was Rs 500,000 for a system up to 10 kW, Rs 750,000 for up to 15 kW and Rs 1 million for up to 20 kW.
Who can apply for the solar tube well scheme?
A Punjab resident who owns at least one acre of agricultural land in the district where they apply, with a valid CNIC and Fard-e-Malkiat. For electric tube wells, a 3-phase connection installed on or before 30 October 2024 and a paid last bill are also required. Only one system is given per family.
Is registration for the solar tube well scheme open?
No official registration date for a new phase has been announced. Phase 1 applications are closed.
Can one family get more than one solar system?
No. The official criteria say only one facility or solar system is given per family.
Where do I apply when registration opens?
Phase 1 applications were taken on cmstp.punjab.gov.pk, and the form was also available on agripunjab.gov.pk. Wait for the Agriculture Department's announcement for the next round.
Source: Eligibility criteria from the official portal cmstp.punjab.gov.pk, with reports in The Nation (16 May 2025), The Nation (2 February 2025) and Daily Times (3 January 2025).
The featured image is an AI-generated illustration and does not show a tube well installed under the scheme.
Comments (0)
No Comments Found