Quick Facts
Introduction
CM Maryam Nawaz has approved Phase 2 of the Punjab free solar scheme for 100,000 homes. System sizes, likely eligibility and why registration is not open yet.
The first phase of Punjab's free solar scheme drew more than 350,000 applications for a limited number of systems, so many families who missed out have been waiting for a second round. That round has now been approved. The bad news for anyone in a hurry is that you cannot apply today, because the government has not yet opened registration or announced how it will work.
For related updates, explore Banking Info, Scholarships, Jobs and for more information.
This article explains what has been approved, what each household will get, who is likely to qualify based on the Phase 1 rules, and what to do while you wait.
Phase 2 at a Glance
| Detail | Information |
|---|---|
| Scheme | CM Punjab Free Solar Panel Scheme, Phase 2 |
| Approved by | Chief Minister Punjab Maryam Nawaz Sharif |
| Target | 100,000 households (raised from 90,000) |
| Under 100 units a month | 600-watt inverter and one solar panel |
| 100 to 200 units a month | 1,200-watt inverter and two solar panels |
| Cost to the household | Free |
| Registration | Not started yet. No date announced. |
What Has Been Approved
The decision was taken at a special energy meeting in Lahore chaired by the Chief Minister, as reported on 19 and 20 November 2026. Because of the strong response to the first phase, the number of free systems for the new round was raised from 90,000 to 100,000.
The same meeting approved other clean energy plans, according to news reports. These include a pilot project for 5,000 solar panels, 40 solar water schemes in Cholistan, and energy audits of all major hospitals so that solar systems can be sized to each hospital's needs. A waste-to-energy pilot also got approval in principle.
What Each Household Will Get
Phase 2 keeps the two-slab system, linked to how much electricity a home uses each month:
| Monthly use | Inverter | Solar panels |
|---|---|---|
| Less than 100 units | 600 watts | 1 panel |
| 100 to 200 units | 1,200 watts | 2 panels |
This matches the first phase, where the kits were described as about 0.55 kW and 1.1 kW systems. In Phase 1 the kit included the panels, the inverter, a mounting stand, wiring and free installation at home. It did not include a battery. The government has not said whether Phase 2 kits will be different.
What does this mean in practice? A one-panel system will not run an air conditioner, but during daylight it can cover fans, lights, a phone charger and a small TV in many homes. That is where the savings come from. According to figures shared at the Phase 2 meeting, families who received systems in Phase 1 cut their monthly bills by about a third, and some by nearly half. If you want to understand how panel output works, see our guide on how solar panels work.
Who Is Likely to Qualify
The Phase 2 eligibility rules have not been published yet. In Phase 1, applicants had to meet these conditions:
- A domestic (household) electricity connection in Punjab.
- Monthly use of up to 200 units.
- Sanctioned load of up to 2 kW.
- The connection in the applicant's own name, with a valid CNIC.
- No record of electricity theft and no unpaid defaulted bill.
In Phase 1, unit use was checked against a fixed past bill, and winners were picked by computerised balloting because applications far exceeded the number of systems. It is reasonable to expect similar rules this time, but wait for the official notice before you assume anything, especially about which month's bill will be used.
Phase 1 in Numbers
| Phase 1 | Figure |
|---|---|
| People who registered | More than 350,000 |
| Homes that received solar systems | 89,869 |
| Reported bill reduction | About one third, nearly half in some homes |
With 100,000 systems in Phase 2 and a long list of people who missed out last time, competition is likely to be high again. You can read how the earlier rounds worked in our articles on the Free Solar Panel Scheme 2025 and the CM Punjab Roshan Gharana scheme.
Registration Has Not Started
This is the most important point. Applications for Phase 2 are not open, and the government has not announced the start date or the method of applying. Any website, WhatsApp message or agent asking you to "register now" for Phase 2 is not following an official announcement.
In Phase 1, applications were taken through the official portal cmsolarscheme.punjab.gov.pk and by SMS to 8800. Registration was free. Phase 2 may use the same channels, but this has not been confirmed.
What You Can Do Now
- Check your last few electricity bills and note your monthly units. If you are close to 100 or 200 units, that will decide which kit you could get.
- Make sure the connection is in your own name. If the meter is still in a deceased parent's or the landlord's name, ask your DISCO about the name change process.
- Clear any unpaid bill, because defaulters were not eligible in Phase 1.
- Keep your original CNIC, a recent bill with the reference number, and an active mobile number registered in your name ready.
- Follow official Punjab government channels for the registration date. We will also update this page when it is announced.
Beware of Fake Registration
Free schemes attract fraudsters. Nobody can sell you a place in the ballot, and there was no fee to apply in Phase 1. Do not pay any "registration fee" or "processing charge", and never share an OTP, bank PIN or card code with anyone who calls about solar panels. If you are thinking of buying a system yourself instead of waiting, check current market rates in our solar panel prices report.
What Has Not Been Announced Yet
- The registration start and closing dates.
- Whether the portal and SMS 8800 will be used again.
- The final eligibility rules and which bill month will be checked.
- Whether Phase 1 applicants who were not selected must apply again.
- The ballot and installation schedule.
FAQs
Has the Punjab Free Solar Scheme Phase 2 been approved?
Yes. Chief Minister Maryam Nawaz Sharif has approved Phase 2 with a target of 100,000 households.
What will homes using less than 100 units get?
They will get a 600-watt inverter and one solar panel, free of cost.
What will homes using 100 to 200 units get?
They will get a 1,200-watt inverter and two solar panels, free of cost.
Has registration for Phase 2 started?
No. Registration has not started, and the date and method of applying have not been officially announced.
Is a battery included in the free solar kit?
In Phase 1 the kit did not include a battery. The government has not said that Phase 2 will be different.
Can homes using more than 200 units apply?
No. Both phases are for households using up to 200 units a month.
Source: Announcement of Phase 2 by the Government of Punjab, with background from Pakistan Truth and ProPakistani. Phase 1 rules are as reported for the first round of the scheme.
The featured image is an AI-generated illustration and does not show a system installed under the scheme.
Comments (0)
No Comments Found